[1]
“ESTIMASI WAKTU REPARASI KM. WILIS MENGGUNAKAN CRITICAL PATH METHODE ”, SENSISTEK, vol. 7, no. 2, pp. 105–112, Nov. 2024, doi: 10.62012/sensistek.v7i2.41687.