“UJI MODEL PEMECAH GELOMBANG RUBBLE MOUND BERBASIS REKAYASA PROFIL LERENG”. Riset Sains dan Teknologi Kelautan, vol. 1, no. 1, September 2018, hlm. 44-49, https://doi.org/10.62012/sensistek.v1i1.12975.