Hasanuddin University Training Center and Convention Hotel Electrical Installation Study

Authors

  • Andi Muh Iqbal Firaldi
  • Ansar Suyuti
  • Fitriyanti Mayasari

Keywords:

Electrical Installation, General Electrical Installation Regulations (PUIL), Current Carrying Capacity (KHA), Electrical Conductor

Abstract

The increasing demand for electric power, especially in the field of electrical installations, requires a technically reliable plan. A good electrical installation system in the building must comply with the Indonesian National Standard (SNI) and General Electrical Installation Regulations (PUIL), so that electrical installations in buildings can work effectively and efficiently and can overcome disturbances that occur in the process of distribution network or distributing electricity to the building. The overall study of the electrical installation at the Training Center and Convention Hotel, Hasanuddin University aims to determine the feasibility of the electrical installation system with the most recent PUIL standards. The method used in this study started with collecting the data, calculating the required illumination value according to the function of each room, and determining the type of conducting CRC installed in the building. The results of this study for data processing obtained the number of required illumination values ​​installed using the lumen method equation, where the number of armatures varies according to the function of each room. The diameter of the current carrying capacity (KHA) used in a conductor is NYM 5 x 185 mm2, with the value of the current flowing in the main KHA is 389.22 A, and the total power used in the building is 221.781 Watt with installed loads such as air conditioners, lighting, and electric sockets. The control system, protection system, and earthing system contained in the building can be said to be operating correctly and meets PUIL 2011 standards.

Published

2023-06-09