Umar, H., Ashury, A. and Ayyub, M. (2023) “Dredging Analysis at Makassar New Port”, Maritime Park: Journal of Maritime Technology and Society, 2(1), pp. 1–7. doi: 10.62012/mp.v2i1.24087.