Study on the Design and Implementation of BPPT-lock Armored Groin for Sediment Control Structure in Front of Sea Water Intake. (2023). Zona Laut Jurnal Inovasi Sains Dan Teknologi Kelautan, 4(3), 240-247. https://doi.org/10.62012/zl.v4i3.28244