Lifting Structural Assessment of a Working Basket Installed on a Hydraulic Workover Unit (EHR 340K)

Main Article Content

Calista Maharani
Luh Putri Adnyani
Nurmawati
Muhammad Khaisar Wirawan
Indah Melati Suci
Ahmad Azwar Mas'ud
Muhammad Abdul Ghofur Al Hakim
Muhammad Iqra Prasetya

Abstract

The Hydraulic Workover Unit (HWU) is a critical piece of equipment in the oil and gas industry, widely used for well maintenance operations. One of the main components of the HWU is the working basket, which serves as a designated workspace for personnel and must be transported through a lifting process prior to installation on an offshore platform. Lifting operations involve significant risks and therefore require thorough technical analysis to ensure structural safety and reliability. This study aims to analyze the structural behavior of the working basket of the HWU EHR 340K during lifting operations. The analysis was conducted using SACS software. The results indicate that all structural members satisfy the unity check requirements with values less than one, and that the sling forces remain within the allowable capacity limits. Consequently, the proposed lifting configuration is considered safe and suitable for implementation in the lifting process of the HWU working basket.

Downloads

Download data is not yet available.

Article Details

How to Cite
Maharani, C., Adnyani, L. P., Nurmawati, Wirawan, M. K., Suci, I. M., Mas'ud, A. A., … Prasetya, M. I. (2026). Lifting Structural Assessment of a Working Basket Installed on a Hydraulic Workover Unit (EHR 340K). Zona Laut Jurnal Inovasi Sains Dan Teknologi Kelautan, 169–176. Retrieved from https://journal.unhas.ac.id/index.php/zonalaut/article/view/49412
Section
Offshore Building Technology and Engineering
Received 2026-01-14
Accepted 2026-06-06
Published 2026-07-21

References

[1] International Energy Agency (IEA). "Energy demand and oil & gas share." https://www.undrr.org/understanding-disaster-risk/terminology/hips/tl0308?utm (accessed 13 January 2026, 2026).

[2] Y. Redutskiy, C. M. Camitz-Leidland, A. Vysochyna, K. T. Anderson, and M. Balycheva, "Safety systems for the oil and gas industrial facilities: Design, maintenance policy choice, and crew scheduling," Reliability Engineering & System Safety, vol. 210, p. 107545, 2021/06/01/ 2021, doi: https://doi.org/10.1016/j.ress.2021.107545.

[3] N. Gershon, "Oilfield Equipment Maintenance Management," vol. 1, pp. 1-10, 09/18 2025.

[4] N. Ohio, C. Anyadiegwu, and C. Ukwujiagu, "Hydraulic Workover Unit (HWU) Application in Down-hole Milling Operations in Niger Delta," African Research Review, vol. 8, no. 3, pp. 108-115, 2014.

[5] F. Yunus, J. Dufour, A. Ripayre, M. Mercier, C. Suro, and E. Sredensek, "A Unique Experience of Using Hydraulic Workover Unit (HWU) for Re-entry and Drilling Operation Onshore Gabon," in SPE/IADC Middle East Drilling Technology Conference and Exhibition, 2005: SPE, pp. SPE-97373-MS.

[6] PT Elnusa Tbk. "PT Elnusa Tbk: Total solution energy services company." https://www.scribd.com/document/723476466/Elnusa-Services-Catalogue?utm (accessed.

[7] M. F. Pramudiansyah and Y. S. Hadiwidodo, "Trunnion Structure Analysis with Rigging Variations at The Loadout Stage During Lifting Jacket Platform Process," International Journal of Offshore and Coastal Engineering (IJOCE), vol. 9, no. 1, 2025.

[8] Y. Hadiwidodo and R. Permana, "Strength analysis of crane hook structure with trapezoidal cross-section based on rigging configuration on the upper deck lifting process," in IOP Conference Series: Earth and Environmental Science, 2023, vol. 1166, no. 1: IOP Publishing, p. 012033.

[9] R. Iqbal Gayuh, M. Yeyes, and S. Yoyok, "Analisis Keandalan Struktur Padeye Berdasarkan Konfigurasi Rigging pada Lifting Upper Deck Modul MODEC dengan Pendekatan Dinamik. Jurusan Teknik Kelautan," Technical Journal, 2016.

[10] A. Franciska, T. Susilo, Z. Hilmy, and E. Kurniawan, "Design Dan Analisis Lifting Arrangement Yang Optimal Untuk Pengangkatan Project Modul Berri Berlokasi Di Perusahaan Saipem Taqa Al-Rushaid Yard," Jurnal Jalasena, vol. 2, no. 1, pp. 28-40, 2020.

[11] F. Noviantoro and I. Kusumaningtyas, "Studi Kasus: Cargo Carrying Unit."

[12] E. H. Manurung, K. Sawito, and M. G. Wenno, "Design Dan Analisis Lifting/Rigging Pada Platform Kedung Keris Dengan Bantuan Software Sacs Versi 5.7," in Seminar Nasional Ketekniksipilan, Infrastruktur dan Industri Jasa Konstruksi (KIIJK), 2021, vol. 1, no. 1, pp. 419-422.

Similar Articles

1 2 3 4 5 6 7 8 9 10 11 12 13 14 > >> 

You may also start an advanced similarity search for this article.