Analisis Stabilitas Decommissioning Barge 400 Feet Ketika Lifting Operation

Main Article Content

Alan Dicky Swans Saragih
Destyariani Liana Putri
Alamsyah Alamsyah
Anggoronadhi Dianiswara

Abstract

ecommissioning is the final stage of the life of a platform located offshore in order to support the decommissioning
activities that will be carried out, a modified barge is designed to become a tool that can assist the dismantling of offshore
platforms. The modification made is by adding an appending frame whose function is to lift the platform that is ready to
be dismantled. Of course, not only that is a consideration in the modification of the decommissioning barge but also the
planning of the stowage plan design for the modified barge model so that the components and cargo on the barge can be
placed in the appropriate position so that the designed barge has a capacity that matches the purpose of the barge. Then
when you have made a stowage plan for the decommissioning barge, the next step will be modeling the barge starting
from making the hull to the load and also the tank. When all these parts have been made, validation is carried out to
compare the value of the model with that in the stability booklet, if so, the next step is to create a code using the moses
executive. Analysis when lifting that has been simulated in this study getting a value with the highest CoG point variation,
the farthest and with a draft variation of 4.5m, 5.5m, 5.8m, it is found that the stability value meets the DNVGL-ST-N001
criteria in the GM (metacenter height) value, intact range, area ratio.

Downloads

Download data is not yet available.

Article Details

How to Cite
Saragih, A. D. S., Putri, D. L., Alamsyah, A., & Dianiswara, A. (2023). Analisis Stabilitas Decommissioning Barge 400 Feet Ketika Lifting Operation. Zona Laut Jurnal Inovasi Sains Dan Teknologi Kelautan, 4(3), 211–218. https://doi.org/10.62012/zl.v4i3.27699
Section
Offshore Building Technology and Engineering

References

“Peraturan Pemerintah Epublik Indonesia Nomor 17 Tahun 1974 Tentang Pengawasan Pelaksanaan Eksplorasi Dan Eksploitasi Minyak Dan Gas Bumi Di Daerah Lepas Pantai.”

“Peraturan Menteri Energi Dan Sumber Daya Mineral Republik Indonesia Nomor 01 Tahun 2011 Tentang Pedoman Teknis Pembongkaran Instalasi Lepas Pantai Minyak Dan Gas Bumi.” [Online]. Available: Www.Djpp.Depkumham.Go.Id

“Dnvgl-St-N001 Marine Operations And Marine Warranty (Edition: 2016-06).” [Online]. Available: Https://Mww.Dnvgl.Com/Document/Get?Projectid=2883&Docname=Dnvgl-St-N00...

N. Samson, E. Ogbonnaya, And K. Ejabefio, “Stability Analysis For The Design Of 5000-Tonnes Offshore Work Barge,” International Journal Of Engineering And Technology, Vol. 3, No. 9, 2013.

N. Samson And A. Sidum, “Numerical And Experimental Analysis For The Stability Of A 2500 Tonnes Offshore Work Boat,” Journal Of Applied Sciences And Engineering Research, Vol. 3, 2014, Doi: 10.6088/Ijaser.030600004.

D. Yimtae, M. Aimcharoenchaiyakul, S. Uiyyasathian, M. Svasti-Xuto, And C. Chanvanichskul, “Spe-193981-Ms Converted Barge For Wellhead Platform Decommissioning,” Ms, 2018.

E. Arianti, A. Ghofur, And B. Teknologi Hidrodinamika Bppt, “Teknologi Decommissioning Anjungan Lepas Pantai Terpancang Pasca-Operasi,” Vol. 9, No. 2, 2019.

A. Santoso, J. Prananda, E. Jadmiko, And I. Alfaris Murtadha, “Flat Top Barge 300feet Design Using Portable Dynamic Positioning System,” 2017.

A. Arifin, W. H. Nugroho, And S. Sahlan, “Kajian Stabilitas Wahana Angkut Alpo Sebagai Fungsi Kapasitas Tangki Ballast,” Jurnal Penelitian Enjiniring, Vol. 22, No. 2, Pp. 155–165, Nov. 2018, Doi: 10.25042/Jpe.112018.08.

Maritime New Zealand., Barge Stability Guidelines. Maritime New Zealand, 2006.

Most read articles by the same author(s)

Similar Articles

1 2 > >> 

You may also start an advanced similarity search for this article.