Analysis Of Fbb Block (Fore Bulbous Bow) Scheduling Using The PDM Method
Main Article Content
Abstract
Shipyards play a direct role in the development of maritime transportation in Indonesia. A shipyard is a special place equipped with facilities to support the process of building, repairing and maintaining ships. Scheduling is an important part of a new ship building project, apart from prioritizing a minimum budget and maximizing project quality. Careful project scheduling planning will support the achievement of production targets, both in quantity and quality. A shipyard in Surabaya must have its own innovation and advantages to face these challenges in order to compete with domestic and foreign shipbuilding companies. Therefore, work scheduling must be prepared using effective and efficient methods. In determining scheduling, there are several influencing factors, such as the number of workers, level of work difficulty, production facilities, and material availability. This research aims to optimize processing time planning for ship X's FBB block (rescheduling) based on various delay factors to obtain the fastest processing time for the production process. The results of accelerating critical activities using the PDM method with the alternative of additional labor are considered more efficient, where the actual duration can be accelerated by 35.6%.
Downloads
Article Details

This work is licensed under a Creative Commons Attribution 4.0 International License.
Allow anyone to modify, improve, and make derivative works, even for commercial purposes, as long as they credit to you for the original work.
Accepted 2025-07-08
Published 2025-07-11
References
S. Reksohadiprojo, Manajemen Proyek Edisi Kedua, 2 ed., Yogyakarta: BPFE, 1987.
RD Agustin, “Laporan Tugas Akhir,” Analisa Penjadwalan Pembangunan Blok SS1 B Pada Proses Konstruksi Lambung Kapal Bantu Rumah Sakit Di PT.PAL Indonesia Dengan Metode Precedence Diagram Method (PDM) & Line Of Balance (LoB), 2023.
HR, Aplikasi TI dalam Manajemen Konstruksi, edisi ke-1. ed., Sleman: deepublish, 2014.
F. Taufiqurrohman, “Analisa Penjadwalan Blok SS2A Kapal Bantu Rumah Sakit di PT PAL Indonesia Dengan Menggunakan Metode Precedence Diagramming Methode (PDM) Dan Project Evaluation dan Review,” PROGRAM STUDI DIPLOMA IV TEKNIK MANUFAKTUR KAPAL POLITEKNIK NEGERI BANYUWANGI, Banyuwangi, 2023.
D. Kurniawan, Dasar-Dasar Teknik Konstruksi Kapal, Jakarta: Kementerian Pendidikan, Kebudayaan, Riset, dan Teknologi, 2022.
I. Soeharto, Manajemen Proyek (Dari Konseptial Sampai Operasional) Jilid 1 Konsep Studi Kelayakan dan Jaringan Kerja, Jl. H. Baping Raya No. 100 Ciracas, Jakarta: Penerbit Erlangga, 1999.
L. Oktafiana and I. Baroroh, “Analisa Perbandingan Metode CPM, PDM, dan PERT dalam Perencanaan Penjadwalan Reparasi Kapal KN.RB 309 Ternate 01,” Berkala Sainstek, vol. 10, tidak. 3, hal.162-174, 2022.
Elviyanti, IA Zuliksio dan H. Lalan, “Analisa Jadwal Dengan Precedence Diagram Method (PDM) Proyek Gedung oleh PT.X,” Jurnal Penelitian dan Pengembangan Scientech, vol. 5, tidak. 1, hal.449-458, 2023.
MDS Pradana, W. Amiruddin dan A. Wibawa, “Jurnal Teknik Perkapalan,” Analisa Percepatan Durasi Proyek Reparasi Kapal BC60002 dengan Metode Precendence Diagram Method (PDM) dan Simulasi Monte Carlo, vol. 12, tidak. 1, hal. 1-11, 2024.
MAA Maulana dan M. Basuki, “Analisis Pengaruh Jumlah Jam Orang (Man Hour) terhadap Tingkat Produktivitas Galangan Kapal di Surabaya,” Jurnal Ilmu Teknik dan Teknologi Maritim, vol. 2, tidak. 3, hal.175-184, 2023.
B. Cicin-Saint dan RK Knect, "Manajemen Pesisir dan Laut Terpadu," Island Press, Washington DC, 1998.