Pra-Kelayakan Konseptual PLTN Terapung 250 MWe di Maluku Utara: Integrasi Sistem Kelistrikan, Keselamatan Tapak, dan Analisis Ekonomi

Isi Artikel Utama

Muhammad Hadid Kaharuddin
A. Muhammad Ikram
Muh. Asyhari Ramadhan
Fuad Mahfud Assidiq

Abstrak

Electricity supply disparities in archipelagic systems create demand for low-emission baseload generation, yet plant capacity must be compatible with grid size, site safety, and financing conditions. This study develops a conceptual pre-feasibility assessment of a 250 MWe floating nuclear power plant (FNPP) for North Maluku by integrating energy-demand screening, floating-structure design basis, nuclear-maritime siting requirements, stationkeeping, and engineering-economic analysis. At a 90% capacity factor, annual generation is estimated at 1,971 GWh, compared with approximately 1,356.62 GWh of electricity distributed in North Maluku. The proposed unit would therefore produce 45.3% more annual energy than current distribution and its rated output would exceed the system's average load, making interconnection, firm industrial off-take, reserve provision, or a smaller modular unit essential. An illustrative economic screening based on USD 7,000/kW CAPEX, a 60-year operating life, five-year construction, an 8.28% discount rate, a 90% capacity factor, and a tariff of IDR 1,877/kWh yields an NPV of USD 48.6 million, an IRR of 8.52%, a 14-year payback period from project start, and an LCOE of approximately IDR 1,831/kWh. The project is only marginally viable and remains highly sensitive to capital cost, tariff, capacity factor, and financing rate. The Halmahera offshore area cannot be declared suitable based only on water depth and available space; seismic, volcanic, tsunami, metocean, geotechnical, radiological dispersion, navigation, physical security, and emergency preparedness assessments are required. FNPP may be retained as a long-term option, but an investment decision requires grid-compatible unit sizing, staged site investigation, integrated nuclear-maritime safety design, and a bankable off-take model.

Rincian Artikel

Bagian

Teknologi Kelautan

Cara Mengutip

Pra-Kelayakan Konseptual PLTN Terapung 250 MWe di Maluku Utara: Integrasi Sistem Kelistrikan, Keselamatan Tapak, dan Analisis Ekonomi. (2026). Riset Sains dan Teknologi Kelautan, 1-13. https://doi.org/10.62012/fjscb057

Referensi

A. Abdurrahman, Kabupaten Halmahera Tengah Dalam Angka 2024, 1st ed. Badan Pusat Statistik, 2024.

Badan Pengawas Tenaga Nuklir, Rekomendasi Kebijakan Pra Perizinan PLTN di Indonesia. BAPETEN, 2023.

J. Buongiorno, J. Jurewicz, M. Golay, and N. Todreas, “The offshore floating nuclear plant concept,” Nuclear Technology, vol. 194, no. 1, pp. 1–14, 2017.

International Atomic Energy Agency, Advances in Small Modular Reactor Technology Developments. Vienna, Austria: IAEA, 2020.

International Maritime Organization, Future Guidelines for Floating Nuclear Power Plants. London, U.K.: IMO, 2019.

International Maritime Organization, International Code for the Safe Carriage of Packaged Irradiated Nuclear Fuel, Plutonium and High-Level Radioactive Waste on Board Ships (INF Code). London, U.K.: IMO, 2022.

I. Julian, “RI eyes floating nuclear power plants for eastern regions, targets first on-grid reactor by 2029,” Indonesia Business Post, 2025.

Kementerian Energi dan Sumber Daya Mineral, “Konsumsi listrik masyarakat meningkat, tahun 2023 capai 1.285 kWh/kapita,” 2024.

J. Liou, “What are small modular reactors (SMRs)?,” International Atomic Energy Agency, 2023.

I. N. Pujawan, Ekonomi Teknik, 2nd ed. Surabaya: Penerbit Guna Widya, 2010.

ThorCon Power, “ThorCon ajukan permohonan pembangunan PLTN pertama di Indonesia,” 2025.

International Atomic Energy Agency, Small Modular Reactors: Advances in SMR Developments 2024. Vienna, Austria: IAEA, 2024.

International Atomic Energy Agency, Deployment of Floating Nuclear Power Plants: Benefits and Challenges. Vienna, Austria: IAEA, 2025.

World Nuclear Association, Facilitating Global Deployment of Floating Nuclear Power Plants. London: World Nuclear Association, 2025.

World Nuclear Association, “Nuclear power in Indonesia,” World Nuclear Association Information Library, 2026.

Q. Wang, X. Li, Y. Zhang, and J. Liu, “The development of floating nuclear power platforms,” Sustainability, vol. 15, no. 4, art. no. 3022, 2023.

V. Röben, “Floating nuclear power plants under the law of the sea,” The International Journal of Marine and Coastal Law, vol. 40, no. 2, pp. 350–386, 2025.

American Bureau of Shipping, Pathways to Low Carbon: Floating Nuclear Power Plants. Houston, TX: ABS, 2024.

M. A. Dowling, “Class requirements for floating nuclear power plants,” in Proc. IAEA Conference on Small Modular Reactors and Their Applications, Vienna, Austria, 2024.

Badan Pengawas Tenaga Nuklir, Laporan Kinerja BAPETEN Tahun 2023. Jakarta: BAPETEN, 2024.