Re-Design The Filling Room Of The Ship To Change The Function Of Barge To Oil Barge 5000 DWT.

Main Article Content

Urip Prayogi

Abstract

Barge or Barge 5000 DWT is a means or means of sea transportation that contains coal. PT Maritim Transportindo is engaged in the shipping transportation industry, which provides barges to transport coal. Based on these problems, a redesign of the oil barge will be planned according to the BKI class standards. The results of planning using the standard empirical calculation method of BKI Vol II 2016, the results of the design of the load space obtained 5 loading spaces with each size of loading space, namely loading space 1 and 2 obtained 10,980 mm in length, 3 and 4 load spaces obtained 12,810 mm in length. , load space 5 is obtained 10,980 mm in length. Based on the planning of the loading and unloading system, the pump for loading and unloading system has a planned pipe diameter of 125 mm with a capacity of 2 main loading and unloading pumps, namely 218,382 m3 / hr with 2 hours of main pump power 14, 12 Kw. The capacity of the loading and unloading standby pump is 109.191 m3 / hr with a pump power of 7.0628 Kw.


 

Downloads

Download data is not yet available.

Article Details

How to Cite
Prayogi, U. (2021). Re-Design The Filling Room Of The Ship To Change The Function Of Barge To Oil Barge 5000 DWT. Zona Laut Jurnal Inovasi Sains Dan Teknologi Kelautan, 2(1), 14–19. https://doi.org/10.62012/zl.v2i1.13435
Section
Offshore Building Technology and Engineering

Deprecated: json_decode(): Passing null to parameter #1 ($json) of type string is deprecated in /home/journal33/public_html/plugins/generic/citations/CitationsPlugin.inc.php on line 49

References

N. Samson, E. Ogbonnaya, and K. Ejabefio, “Stability Analysis for the Design of 5000-Tonnes

Offshore Work Barge,” vol. 3, no. 9, pp. 849–857, 2013.

W. Barge, “Calculation for Hull Strength Construction in Offshore Structures (A Case Study of 5000t

Work Barge),” West African J. Ind. Acad. Res., vol. 8, no. 1, pp. 3–12, 2013.ZONA LAUT, Vol. 2, No. 1 Maret 2021 19

A. Ramadhan et al., “Analisa Kekuatan Konstruksi Double Bottom Pada Frame 46 Sampai Frame 50

Akibat Perubahan Dari Single Hull Ke Double Hull Pada Kapal Tanker 13944 Ltdw Dengan Metode

Elemen Hingga,” J. Tek. Perkapalan, vol. 4, no. 4, pp. 858–867, 2016.

B. K. Indonesia, “Pedoman Lambung Edisi 2016 Biro Klasifikasi Indonesia,” vol. 2, 2016.