A Comprehensive Risk Control Analysis of Shorebase Loading and Unloading Processes Using HIRARC, HAZOP, and Delphi Methodologies

Main Article Content

Dian Aulia Hidayati Chardiwan
Luh Putri Adnyani
Muhammad Khaisar Wirawan

Abstract

Shorebase loading and unloading operations in the offshore oil and gas supply chain involve intensive interactions among heavy equipment, workers, dock conditions, and hazardous materials. Although standard safety procedures are commonly implemented, previous assessments have often applied HIRARC, HAZOP, or expert judgment separately, leaving a methodological gap in how field-based hazards, process deviations, and expert validation can be integrated into a single risk-control framework. This study addresses that gap by combining Hazard Identification, Risk Assessment, and Risk Control (HIRARC), Hazard and Operability Study (HAZOP), and the Delphi method to analyze loading and unloading risks at PT. X, East Kalimantan. HIRARC identified 14 work-activity hazards, of which 57.14% were categorized as moderate risk and 42.86% as insignificant risk. HAZOP identified 14 operational deviations, consisting of 71% low-risk and 29% moderate-risk deviations. Expert validation through two Delphi iterations confirmed key risk priorities related to working at heights, hazardous-material handling, heavy-equipment operation, night work, and adverse weather. The integrated approach demonstrates that HIRARC is effective for capturing direct field hazards, HAZOP strengthens deviation-based process analysis, and Delphi reduces subjectivity by validating mitigation priorities through expert consensus. The results provide practical recommendations for improving shorebase safety governance through routine inspections, competency-based training, lighting improvement, traffic control, early warning systems, and stricter supervision.

Downloads

Download data is not yet available.

Article Details

How to Cite
Chardiwan, D. A. H., Adnyani, L. P., & Wirawan, M. K. (2026). A Comprehensive Risk Control Analysis of Shorebase Loading and Unloading Processes Using HIRARC, HAZOP, and Delphi Methodologies. Maritime Park: Journal of Maritime Technology and Society, 275–291. Retrieved from https://journal.unhas.ac.id/index.php/maritimepark/article/view/49439
Section
Marine Transportation and Port Management
Received 2026-01-15
Accepted 2026-06-05
Published 2026-06-21

References

[1] Republic of Indonesia, Law of the Republic of Indonesia Number 13 of 2003 concerning Manpower, 2003.

[2] L. Novita and E. D. Nawawinetu, “Risk assessment of overhead crane (OHC) double girder operation in the Kapal Niaga Division in PT PAL Indonesia (Persero),” Journal of Vocational Health Studies, vol. 2, no. 1, pp. 1–7, 2018.

[3] A. Aufarisza, “Analisis risiko pekerjaan pemindahan barang dengan forklift menggunakan metode HIRARC dan penentuan risk ranking menggunakan fuzzy logic control: Studi kasus pada perusahaan distributor minuman,” Politeknik Perkapalan Negeri Surabaya, Surabaya, Indonesia, 2017.

[4] Y. Bai and J. K. Paik, Risk Assessment and Management for Ships and Offshore Structures. Oxford, U.K.: Gulf Professional Publishing, 2024.

[5] A. Brandsæter, “Risk assessment in the offshore industry,” Safety Science, vol. 40, no. 1–4, pp. 231–269, 2002.

[6] O. Ramisdar, “Analisis risiko kecelakaan kerja pada proses bongkar muat dengan metode job safety analysis (JSA) dan hazard and operability study (HAZOPS) di PT Pelindo IV (Persero) Terminal Peti Kemas Makassar,” Faculty of Medicine and Health Sciences, Universitas Islam Negeri Alauddin Makassar, Makassar, Indonesia, 2019.

[7] C. Ahmad, I. N. M. Zin, M. K. Othman, and N. H. Muhamad, “Hazard identification, risk assessment and risk control (HIRARC) accidents at power plant,” in MATEC Web of Conferences, vol. 66, 2016, Art. no. 00105.

[8] D. S. Purnama, “Analisa penerapan metode HIRARC (Hazard Identification Risk Assessment and Risk Control) dan HAZOPS (Hazard and Operability Study) dalam kegiatan identifikasi potensi bahaya dan risiko pada proses unloading unit di PT Toyota Astra Motor,” Universitas Mercu Buana Bekasi, Bekasi, Indonesia, 2015.

[9] F. Lees, Lees’ Loss Prevention in the Process Industries: Hazard Identification, Assessment and Control. Oxford, U.K.: Butterworth-Heinemann, 2012.

[10] Wang, J. Wang, J. Li, F. Chen, Y. Zhi, and Z. Wang, “Research on quantification of HAZOP deviation based on a dynamic simulation and neural network,” International Journal of Industrial Engineering, vol. 29, no. 6, 2022.

[11] A. de J. Penelas and J. C. Pires, “HAZOP analysis in terms of safety operations processes for oil production units: A case study,” Applied Sciences, vol. 11, no. 21, Art. no. 10210, 2021.

[12] J.-Y. Choi and S.-H. Byeon, “HAZOP methodology based on the health, safety, and environment engineering,” International Journal of Environmental Research and Public Health, vol. 17, no. 9, Art. no. 3236, 2020.

[13] N. Lamii, F. Bentaleb, M. Fri, C. Mabrouki, and E. A. Semma, “Use of Delphi-AHP method to identify and analyze risks in seaport dry port system,” Transactions on Maritime Science, vol. 11, no. 1, pp. 185–206, 2022.

[14] R. Khoshfetrat, H. Sarvari, D. W. Chan, and M. Rakhshanifar, “Critical risk factors for implementing building information modelling (BIM): A Delphi-based survey,” International Journal of Construction Management, vol. 22, no. 12, pp. 2375–2384, 2022.

[15] S. Keeney, H. P. McKenna, and F. Hasson, The Delphi Technique in Nursing and Health Research. Hoboken, NJ, USA: Wiley-Blackwell, 2010.

[16] F. I. Khan and S. Abbasi, “Techniques and methodologies for risk analysis in chemical process industries,” Journal of Loss Prevention in the Process Industries, vol. 11, no. 4, pp. 261–277, 1998.

[17] A. Alijoyo, B. Wijaya, and I. Jacob, “A hazard and operability studies: Risk evaluation, risk analysis, consequences, probability, and level of risk,” 2021.

[18] S. Fauziyah, R. Susanti, and F. Nurjihad, “Risk assessment for occupational health and safety of Soekarno-Hatta International Airport accessibility project through HIRARC method,” in IOP Conference Series: Earth and Environmental Science, vol. 700, no. 1, 2021, Art. no. 012048.

[19] Standards Australia/Standards New Zealand, AS/NZS 4360:2004 Risk Management, 2004.

[20] A. Mukharror, D. B. Wibawa, A. N. Sommeng, S. Kartohardjono, and H. Hermansyah, “Assessing the completeness of safeguard identification in hazards and operability (HAZOP) studies for oil and gas facilities as a quality metric: An Indonesian case study,” Process Safety Progress, 2025.

[21] K. Naji, M. Gunduz, and M. M. Mansour, “Development of an integrated hybrid risk assessment system for construction disputes during the preconstruction phase using the Delphi method,” Journal of Construction Engineering and Management, vol. 150, no. 7, Art. no. 04024068, 2024.

[22] Giannarou and E. Zervas, “Using Delphi technique to build consensus in practice,” International Journal of Business Science & Applied Management, vol. 9, no. 2, pp. 65–82, 2014.

[23] S. P. Lestari, Selviana, and L. Suwarni, “Risk analysis of work accidents in the loading and unloading process using job safety analysis (JSA) and hazard and operability study (HAZOPS) methods at PT Pelindo II (Persero) Branch Pontianak,” Indonesian Journal of Administration and Health Research, vol. 1, no. 2, pp. 73–80, 2024, doi: 10.54630/ijahr.v1i2.74.

[24] F. Nurprihatin, F. H. B. Tampubolon, Y. N. Ayu, and A. Vaezi, “Comprehensive HIRARC implementation for port operations: A multi-zone risk management framework,” Journal of Business and Audit Information Systems, vol. 8, no. 2, pp. 32–51, 2025, doi: 10.23893/jbase.v8i2.9003.

[25] Z. Jamil, S. Nordin, M. Miraj, M. Alqahtani, R. A. Shaik, S. Akhter, and A. S. N. Isha, “Sustainable safety practices and hazard management in the oil and gas industry: An HSE perspective,” Frontiers in Public Health, vol. 13, Art. no. 1611106, 2025, doi: 10.3389/fpubh.2025.1611106.

[26] M. Aliabadi, I. Mohammadfam, and S. Khorshidikia, “Human error identification and risk assessment in loading and unloading of petroleum products by road trucks using the SHERPA and fuzzy inference system method,” Heliyon, vol. 10, no. 15, 2024, doi: 10.1016/j.heliyon.2024.e34072.

[27] Z. Liu, L. Jia, and S. Dong, “Refined oil loading and unloading process risk assessment using stochastic colored Petri nets integrated with risk factors,” Technical Gazette, vol. 31, no. 1, pp. 70–78, 2024, doi: 10.17559/TV-20230212000350.

Similar Articles